Tara del Sol is constructed to American standards by an American contractor who has resided in Belize for the past 25 years and has an outstanding reputation for quality construction.
The buildings sit on 6,000 p.s.i. pilings down to bedrock with a 36 inch wide heavy steel reinforced footings 4 feet below the ground level. The units are built with steel reinforced concrete block, with concrete plaster finish on the interior walls, and colorfast "Acroctete" finish on the exterior, for low maintenance. All exterior walls and ceilings are insulated with Styrofoam insulation. Common walls separating the units in building A & C, are double block, each filled with insulation and separated with a 4 inch gap, filled with insulation. This procedure ensures the utmost in privacy. The windows and French doors are "Weathershield" brand, and have double panes filled with argon gas for UV protection. The roof is galvanized "shake" roofing developed in New Zealand by "Decra Roofing". It is also insulated over a concrete slab.
If you would like more information on the Builder as well or information on previous projects, please contact us.
The Progress
Tara del Sol's construction is currently running on schedule. Building A has been completed and is move-in ready, Building B is completed and ready for interior customizing by the Purchaser and, Building C and the pool will be complete by Spring 2007.